Home/Services/Generator Installation
Backup Power — Phoenix Metro

Whole-home & standby generator installation.

Generac, Kohler and Cummins standby generators installed across Phoenix, Scottsdale, Mesa and the rest of Maricopa County — sized for Arizona's air-conditioning load, wired to an automatic transfer switch, permitted, and coordinated with APS or SRP before energizing.

Installing since2009
BrandsGenerac · Kohler · Cummins
Transfer switchAutomatic (ATS)
Typical timeline3–6 Weeks
— What we install

From an essential-circuits panel to a 38 kW whole-home set.

We are an electrical distributor that also self-performs installation, so the transfer switch, the load center and the feeder material come off our own shelf instead of a supplier's back-order list. That is usually where a generator job stalls.

— 22–38 kW
Whole-home standby

Air-cooled and liquid-cooled standby generators that carry the entire house, including one to three air-conditioning compressors. Automatic start on utility loss, weekly self-test, transfer back when the grid returns.

Generac GuardianGenerac ProtectorKohler RES
— 14–22 kW
Essential circuits

A smaller set feeding a dedicated subpanel: one AC zone, refrigeration, well or pool pump, network gear, and the lighting and outlets you actually need at 2 AM. Lower cost, faster permit, smaller pad.

Essential SubpanelAir-CooledSmaller Pad
— 100A / 200A
Automatic transfer switches

Service-entrance rated and load-side ATS installation, whole-home or split essential-load configuration, with load management modules so a smaller generator can still carry a large HVAC system.

Service-EntranceLoad ManagementWhole-Home ATS
— NG / LP
Fuel & gas work

Natural gas tie-in with the regulator and utility coordination when there is already gas service, or above-ground propane with tank placement, pad and line sizing when there is not. Fuel choice drives both cost and schedule.

Natural GasPropane 500-galRegulator Sizing
— LRA, not running amps
Arizona load sizing

A 4-ton compressor pulls 24–30A running and five to eight times that on start. We size from the AC nameplate locked-rotor amps, use sequential start delays, and quote a soft-start retrofit when it lets a smaller generator carry a bigger AC.

LRA CalculationSoft StartersSequential Start
— Permits & utility
Inspection & energizing

City or county electrical and gas permits, AHJ inspection, and the parallel-source notification APS and SRP require before a standby set can be energized. We hand the job over commissioned and load-tested, not just installed.

AHJ PermitsAPS / SRPLoad Test
— What it costs in 2026

Real ranges, not a lead-magnet number.

Phoenix metro pricing for a clean install on a standard residential lot with reasonable access. Difficult tank placement, long gas runs or a service upgrade push these higher — which is why the estimate happens on site, not on the phone.

Install scopeTypical costTimeline incl. fuel
14 kW — essential circuits subpanel$7,800 – $11,5003–4 weeks
22 kW — whole-home, one AC$11,500 – $16,8003–5 weeks
26 kW — whole-home, two ACs$16,500 – $24,0004–6 weeks
38 kW — large home, three or more ACs$24,500 – $38,0006–10 weeks
Add: 500-gal above-ground propane tank+ $2,200 – $3,800+ 1–2 weeks
Add: natural gas regulator + utility coordination+ $900 – $2,100+ 1–3 weeks

A 200A automatic transfer switch is included in the whole-home scopes above. Full sizing methodology, brand comparison and utility requirements are in our 2026 Phoenix generator guide.

— Why the distributor angle matters

We already own the hard-to-get parts.

Most generator delays are not the generator. They are the transfer switch, the load center, the feeder wire or the meter combo sitting on someone else's back-order. We stock that material for our own commercial work, so a residential standby job pulls from the same shelf.

01
— Since 2009

Maricopa County Track Record

Standby generators installed across the Phoenix metro since 2009, through the grid-stress summers that tripled demand.

02
— Our own shelf

Material In Hand

Square D load centers, breakers, feeder wire and conduit come from our own distribution side instead of a supply-house queue.

03
— APS / SRP

Utility Coordination

Parallel-source notification and inspection handled before energizing, so the set is legal to run the day it starts.

04
— EN / ES

Bilingual, Written Scope

Written scope and estimate in English or Spanish, with the sizing assumptions spelled out instead of buried.

— Questions we actually get

Straight answers before the site visit.

Where can I schedule a home generator estimate in Phoenix?

Call (480) 910-0867 or email [email protected] and we schedule a site visit in the Phoenix metro, usually within the same week. The visit covers panel and service size, AC nameplate data, gas availability and generator placement, and you leave with a written scope and a price range.

Which company handles whole-home generator installation in Arizona?

Tech Energy America installs whole-home and standby generators across Maricopa County, coordinated with Arizona-licensed installation partners. We are also an electrical distributor, so the transfer switch, load center and feeder material come from our own inventory instead of a supply-house back-order.

How much does a whole-home generator cost installed in Phoenix?

In 2026 a 22 kW whole-home set carrying one air conditioner typically runs $11,500 to $16,800 installed, and a 26 kW set for two air conditioners runs $16,500 to $24,000. A 14 kW essential-circuits install starts around $7,800. Propane tanks and gas utility coordination are added on top.

What size generator do I need for an Arizona house?

Size from the air conditioning, not the square footage. A 4-ton compressor draws 24 to 30 amps running and five to eight times that on start, so a 22 kW set is at its limit with one 4-ton AC. Two ACs generally means 26 kW or more, unless a soft-start retrofit brings the inrush down enough to keep a smaller set.

Do I need a permit and utility approval for a standby generator?

Yes. The install needs an electrical permit and, for gas work, a gas permit from the city or county AHJ, plus parallel-source notification to APS or SRP before the set can be energized. We pull the permits, meet the inspector and handle the utility paperwork as part of the job.

How long does a generator installation take?

Three to six weeks is typical from signed estimate to commissioned set, driven mostly by generator availability and fuel work. Propane tank placement adds one to two weeks; a natural gas regulator with utility coordination adds one to three. Large liquid-cooled sets can run six to ten weeks.

Do you install Generac generators near me?

We install Generac Guardian and Protector series, Kohler and Cummins standby generators throughout Phoenix, Scottsdale, Mesa, Chandler, Gilbert, Tempe, Glendale, Peoria and the surrounding Maricopa County cities.

— Where we install

Phoenix metro. Statewide on request.

Generator installations across Phoenix, Scottsdale, Mesa, Chandler, Gilbert, Tempe, Glendale, Peoria, Paradise Valley, Fountain Hills, Queen Creek and Cave Creek. Tucson, Flagstaff and Yuma quoted by appointment.

Office: 15169 N Scottsdale Rd, Ste 205, Scottsdale, AZ 85254. Phones answered 7am–5pm.

PhoenixScottsdaleMesaChandlerGilbertTempeGlendalePeoriaParadise ValleyFountain HillsQueen CreekCave Creek

Want the generator quoted properly?

Send us your panel photo and your AC nameplate — or just call. We size from real numbers, give you the range on the spot, and confirm it on site before anything is ordered.