"What size pad-mount do I need?" is the most common call we get from GCs, developers, and electrical engineers on commercial projects between 50 kW and 2 MW across the Phoenix metro. The answer is never just a kVA number — it's a decision shaped by Arizona ambient temperature, utility interconnection rules, future load growth, and what's actually in stock at our Phoenix yard. This guide walks through how we size pad-mounts in real projects.
Step 1 — Nail down connected load vs demand load
Before you even open a transformer catalog, separate two numbers:
- Connected load (kW) — the sum of every nameplate on the one-line
- Demand load (kW) — connected load × diversity factor (how much actually runs at once)
NEC Article 220 lays out demand factors for lighting, receptacles, HVAC, kitchen equipment, and so on. Typical Arizona commercial demand factors we use:
| Load type | Typical demand factor | Notes |
|---|---|---|
| Office lighting + receptacles | 0.50 – 0.65 | Lower for LED-only builds |
| Strip retail (shell + base) | 0.65 – 0.75 | Depends on tenant mix allowance |
| Light industrial / warehouse | 0.55 – 0.70 | Higher if conveyors or compressors |
| Quick-service restaurant (QSR) | 0.80 – 0.90 | Kitchen equipment + rooftop units run concurrently |
| Multi-family (commercial side) | 0.45 – 0.55 | Houses have strong diversity |
| Cold storage | 0.85 – 0.95 | Compressors run near-continuous in AZ summer |
Step 2 — Convert kW to kVA, then apply AZ derating
Transformers are rated in kVA, so convert: kVA = kW ÷ power factor. A conservative 0.85 PF is standard for mixed commercial; LED-heavy builds can justify 0.90.
Now the step most out-of-state engineers miss: Arizona ambient derating. IEEE C57.12.00 rates standard pad-mounts at 30°C average / 40°C peak ambient. Phoenix routinely hits 46°C (115°F) with asphalt-pad surface temps past 65°C. The practical derating curve for ONAN (oil-natural, air-natural) pad-mounts:
| Average ambient over hottest 24h | Capacity derating | Example (1500 kVA nameplate) |
|---|---|---|
| 30°C (standard) | 100% | 1500 kVA usable |
| 35°C | 93% | 1395 kVA usable |
| 40°C (typical AZ summer) | 86% | 1290 kVA usable |
| 45°C (west valley peak) | 80% | 1200 kVA usable |
In practice we add 15–20% to the calculated kVA to cover AZ ambient plus future load growth, then round up to a standard utility size.
Step 3 — Pick a standard utility size, not a weird number
SRP, APS and TEP all have standard pad-mount sizes they'll accept for new service. Specifying a non-standard kVA (like 650 or 1100) triggers engineering review, extended lead times, and sometimes outright rejection.
Standard kVA sizes you should always target first:
- Single-phase pad-mount: 25, 37.5, 50, 75, 100, 167 kVA
- Three-phase pad-mount (small): 75, 112.5, 150, 225, 300, 500 kVA
- Three-phase pad-mount (medium): 750, 1000, 1500, 2000, 2500 kVA
- Three-phase pad-mount (large): 3000, 3750, 5000 kVA
Secondary voltage for commercial AZ is almost always 208Y/120 V (small retail, QSR, office) or 480Y/277 V (industrial, large retail, data center, anything with meaningful motor load or long distribution runs).
Step 4 — Primary side: match the utility
Arizona primary voltages by utility:
| Utility | Common primary voltage | Notes |
|---|---|---|
| SRP | 12.47 kV (most common), 24.9 kV | Specify exact feeder voltage from SRP service planning |
| APS | 12.47 kV, 13.2 kV, 21 kV, 34.5 kV | Varies by substation — confirm with APS |
| TEP (Tucson) | 13.8 kV, 34.5 kV | Lower-voltage distribution common in central Tucson |
| Mohave Electric / Trico / SSVEC co-ops | Varies — 7.2/12.47 kV, 14.4/24.9 kV | Always get a utility letter before buying |
Never buy a pad-mount without the utility service planning letter in hand confirming the primary voltage, phase configuration (grounded wye vs delta), and BIL.
Step 5 — Loop-feed vs radial-feed
This is where projects get into trouble. Ask the utility during the planning phase:
- Radial feed — one primary cable in, bushings and elbows only on one side. Cheaper, standard for small retail and standalone industrial.
- Loop feed — two primary cable positions (in / out), allowing the utility to sectionalize. Required by SRP and APS on many commercial developments and nearly all multi-building sites. Adds ~5–10% to the transformer cost but is often non-negotiable.
Specifying radial when the utility requires loop-feed is one of the most expensive mistakes you can make — you buy the wrong unit, wait 20+ weeks for the right one, and delay energization.
Step 6 — Impedance and short-circuit
Standard impedance for commercial pad-mounts is 5.75% at the ONAN rating. This matters because it drives:
- Available fault current at the secondary (feeds your switchgear/panel short-circuit interrupting rating)
- Voltage regulation under load (lower impedance = tighter regulation, but higher fault current)
- Parallel operation if you ever plan to add a second unit
For 480 V services feeding standard 65 kAIC rated gear, 5.75% impedance on transformers up to 2500 kVA keeps you inside the rating. Larger units (3000+ kVA) often need 6.0–6.5% impedance to stay below 65 kAIC, or you move up to 100 kAIC rated secondary gear.
Worked examples — common AZ commercial projects
Example A: 25,000 sq ft strip retail, Chandler
- Connected load: 350 kW (shell + 8 tenants at 4 W/sqft allowance)
- Demand factor 0.70 → 245 kW demand
- At 0.85 PF → 288 kVA
- AZ summer derating 86% → need 335 kVA installed capacity
- Future growth +15% → 385 kVA
- Specify: 500 kVA, 12.47 kV / 208Y-120 V, 5.75% Z, loop-feed (SRP)
Example B: 80,000 sq ft warehouse with light fabrication, Buckeye
- Connected load: 900 kW (lighting + 5 HP to 50 HP motors + RTUs)
- Demand factor 0.65 → 585 kW demand
- At 0.85 PF → 688 kVA
- AZ summer derating 80% (west valley) → need 860 kVA
- Future +20% (expansion space) → 1032 kVA
- Specify: 1500 kVA, 12.47 kV / 480Y-277 V, 5.75% Z, loop-feed (APS)
Example C: QSR + fuel station pad, Mesa
- Connected load: 180 kW (kitchen + pumps + lighting)
- Demand factor 0.85 → 153 kW demand
- At 0.85 PF → 180 kVA
- AZ ambient derating 86% → need 210 kVA
- Specify: 225 kVA, 12.47 kV / 208Y-120 V, 5.75% Z, radial feed (SRP)
What slows down pad-mount delivery (and how to avoid it)
- Non-standard kVA — stick to the utility standard sizes above
- Non-standard primary — 13.2 kV instead of 12.47 kV adds 8–14 weeks on OEM, we may or may not have stock
- Specifying brand before checking stock — we stock multiple JST, Howard, Virginia, Pennsylvania, ERMCO units in our Phoenix yard; specifying a single brand can push your date out 20+ weeks
- Forgetting the concrete pad — utility won't energize without a code-compliant pad; the pad needs to be ready before the transformer ships
- Not confirming grounding method — grounded wye vs ungrounded wye vs delta primary — this is on the utility letter, never guess
What we have on the yard right now (updated regularly)
Our pad-mount transformers in-stock page lists current inventory. Typical in-stock positions:
- 225 kVA, 500 kVA, 750 kVA, 1000 kVA, 1500 kVA, 2500 kVA
- Primary: 12.47 kV (most common), 24.9 kV (some units)
- Secondary: 208Y/120 V and 480Y/277 V
- Loop-feed and radial-feed configurations
When we have your exact spec on the yard, delivery is 1–5 business days to anywhere in the Phoenix metro and typically 1–3 weeks anywhere in AZ or the Southwest. Compare that to 24–40 weeks for new-build from the OEM.
Related reading
- Pad-mount transformers in stock — Phoenix yard
- All pad-mount and dry-type transformer products
- How to size a commercial transformer in Arizona — full kVA calculation guide
- JST pad-mount vs pole-mount transformer in Arizona
- Arizona summer heat and electrical equipment derating
Need a pad-mount sized and quoted today?
Send us your connected load, utility, service voltage, and target energization date. We'll come back in 24 hours with a sized unit, availability from our Phoenix yard, and delivered price.